HMP SWALESIDE – ISLE OF SHEPPEY

These works were carried out under a Lot 1 Consultant Framework with the MoJ. The role undertaken was initially as a designer which latterly switched to the clients Technical Assessor on appointment of the nominated Contractor Kier.

The works involved the replacement of over 65% of the roof coverings on-site following deterioration of the previous cladding system. This was undertaken by an innovative solution of over cladding the existing sheet which allowed additional insulation to be provided to the accomodation and ancillary buildings.

* project undertaken by Daniel Wicks whilst Director of HLN Architects. Photography courtesy of Google